High reach machine demolishing the Darley Street building at Bradford Markets

Bradford Markets

A complex city-centre demolition project delivered with careful attention to public safety, neighbouring structures and the demands of a constrained site.

High reach machine demolishing the Darley Street building at Bradford Markets

Regeneration · Bradford, West Yorkshire

Project overview

As part of a £21 million investment to revitalise Bradford city centre, Demex undertook the demolition and enabling works at the Bradford Markets site. The project will help create a major new public space and support the development of the city’s markets.

The site on Darley Street has seen significant change since the original structure was built in 1914. For many years, its retail units were occupied by familiar high-street names, including Woolworths, M&S, Burtons, Dorothy Perkins and Evans. The building closed in 2019.

Scope

What the job involved

Asbestos removal and soft strip The fit out and non-structural material were removed before any structural work began.
Robotic demolition Reinforced-concrete floors taken out across four levels, down to the sub-basement, while the existing steel frame was retained.
Scaffolding and propping A full-height scaffold wrap, 20-metre support towers and walling beams, ballasted with 129 kentledge blocks.
Substructure removal Basement and lower-basement floating slabs removed in stages, with back-propping installed as the work progressed.

In detail

How the job ran

Working in a busy city-centre location

The site was bordered by neighbouring properties and busy pedestrian routes, leaving limited space for the works. Managing dust, noise and vibration, and maintaining public safety, was central to the project’s planning.

Monitoring equipment was installed at strategic locations, with readings monitored remotely. Heavy-duty dust-control equipment was used throughout the works, including a bespoke suppression system fitted to Demex’s high-reach machine. Its 28-metre boom carried multiple spray jets to control dust at source.

Structural concerns were also identified at neighbouring properties, particularly along the northern elevation. Demex worked with structural engineers, propping specialists, scaffolders and site engineers to develop a temporary support solution that enabled the demolition to proceed safely.

Specialist demolition and temporary works

Robotic demolition techniques were used to remove sections of reinforced-concrete floors across four levels, down to the sub-basement, while retaining the existing steel frame. This created the access needed for the propping team to install 20-metre support towers and walling beams.

The temporary works included 129 kentledge blocks, each weighing 2.4 tonnes, to provide ballast.

A full-height scaffold wrap was installed around the structure to help protect the surrounding area. Demolition followed a carefully planned sequence, coordinated with the scaffold contractor so sections of the wrap could be removed as the work progressed.

The southern elevation presented a particular challenge. Due to the change in site levels, the façade rose approximately 30 metres above the lower neighbouring property. Brickwork was reduced by hand before specialist cutters and the high-reach machine were used to dismantle the steel frame. Once the structure had been brought down to a suitable height, heavy demolition plant completed the removal to slab level.

Substructure works

Although the original scope called for demolition to slab level, the site’s three levels and surcharge constraints meant that sections of the basement and lower-basement floating slabs also had to be removed.

Working with Mabey Hire, the team progressed from the highest level down. Slab sections were removed in stages to allow back-propping to be installed. The propping was designed to accommodate surcharge loads in excess of 50 tonnes.

The basement works required detailed sequencing and careful access planning. Despite the restricted working area, temporary access ramps and a piling mat were installed to support the operation. Removal of the floating basement slabs enabled the groundworks contractor to begin the next stage of the scheme.

Project delivery

The Bradford Markets project brought together demolition, robotic techniques, complex temporary works and substructure removal in a tightly constrained urban setting. Through detailed planning and close coordination with specialist partners, Demex carried out the works while managing the risks to the public and neighbouring buildings.