Asbestos removal contractors

Discover our range of asbestos services.

Two operatives in protective coveralls lifting a corrugated asbestos cement sheet during a non-licensed asbestos removal

Asbestos

Asbestos removal by the same team

Asbestos removal requires specialist knowledge, careful planning and strict attention to safety. At Demex Northern Ltd, our dedicated asbestos team manages removal works as part of our wider service offering, providing clients with a coordinated approach from initial assessment through to safe removal and disposal.

What we do

Our asbestos services

Non-licensed removal

Asbestos cement, textured coatings and similar materials, removed under controlled conditions. Licensed carriage and disposal, documented end to end.

Planned works

Specific planned works tailored to your specific asbestos needs.

Background analyticals

Background, reassurance and clearance testing through the works.

Consignment

Licensed carriage and disposal, documented end to end.

How it runs

How our asbestos projects run

  1. Survey

    Identify and record, intrusively where the works require it.

  2. Plan

    Method statement, notification and enclosure design agreed before mobilising.

  3. Remove

    Under controlled conditions, monitored throughout.

  4. Clear

    Four stage clearance and certification, then the demolition continues.

In detail

What asbestos removal involves

Types of surveys

A management survey tells you what is present so a building can be occupied safely. A refurbishment and demolition survey is intrusive and is the one you need before anything is stripped or taken down.

Removal under controlled conditions

At Demex Northern Ltd, we assess each asbestos removal task before work begins to confirm the material, its condition and whether the work qualifies as non-licensed. Our trained team then follows a task-specific plan, using appropriate controls to minimise fibre release and protect people on and around the site. Where notification is required, we complete it before work starts. We package and dispose of asbestos waste in accordance with the relevant regulations, with the work coordinated alongside the wider project to keep disruption to a minimum.

The benefits of a demolition and asbestos team

Having our own specialist asbestos team allows us to manage removal works alongside our wider operations, providing greater control over planning, scheduling and delivery. With both teams working together, we can coordinate projects more efficiently, respond quickly to changing site requirements and minimise disruption. This means fewer external dependencies, better communication and a more streamlined service for our clients.

Documentation, notification and the audit trail

Notifiable work is notified to the enforcing authority before it begins, and where the work is licensed the fourteen day notice period should be built into the programme from the point the method is agreed. Throughout the works we maintain the plan of work, the site records, air monitoring results and the waste consignment notes, and at completion we hand over the clearance records, including the certificate of reoccupation issued by an independent analyst where the work was licensed. Those records matter well beyond practical completion, because they form part of the building file and are frequently requested during later transactions, refinancing or subsequent refurbishment. Keeping them complete and legible is a deliverable in its own right.

How asbestos affects the programme

Asbestos is rarely the longest activity on a programme but it is very often the one that determines the critical path. The survey position dictates when enclosures can be built, the notification period dictates when notifiable work can start, and clearance dictates when following trades can enter. Sequencing those three correctly can remove weeks from a project. Because the asbestos team and the demolition team sit in the same business, the two programmes are written together rather than negotiated between separate appointments, and adjustments on site can be made the same day.

Where we work

Asbestos removal contractors across the UK

Our asbestos team is based in Rotherham and works nationwide alongside our demolition contracts.

  • Rotherham
  • Sheffield
  • Doncaster
  • Barnsley
  • Leeds
  • Wakefield
  • Bradford
  • York
  • Hull
  • Manchester
  • Liverpool
  • Newcastle
  • Nottingham
  • Derby
  • Birmingham
  • London

Questions

Asbestos FAQs

What is the difference between a management and a refurbishment survey?

A management survey establishes what is present so a building can be occupied safely. A refurbishment survey is intrusive and is the one you need before any strip out or demolition starts.

How long does notifiable work take to start?

Notifiable non-licensed work is notified to the enforcing authority before it starts. Licensed work needs fourteen days’ notice to the HSE and is carried out by a licensed contractor we bring in. Plan for that period from the point the method is agreed, and talk to us early so it runs alongside the rest of the programme rather than after it.

Do you do the clearance testing yourselves?

No, and that is the point of it. Clearance is carried out by an independent accredited analyst. We manage the process and hand over the certification.

What if something is found that was not in the survey?

Work stops in that area and we assess it. Because the asbestos team is ours, the response starts the same day rather than waiting on a third party to become available.

Do you hold an HSE asbestos licence?

No. We carry out non-licensed and notifiable non-licensed asbestos work with our own team. Where a job includes licensed work, such as sprayed coatings or pipe lagging, we bring in a licensed contractor and run it as part of the same programme rather than handing the job over.

Get in touch

Tell us what needs to come down

Send a drawing, a site address or a photo on your phone and we will come back with a price.