What a refurbishment and demolition survey covers

The survey needed before demolition starts is not the same as a management survey. Here is the difference, and when each one applies.

Maddison Marketing Manager
Asbestos
A surveyor in a protective suit and respirator recording findings on a clipboard inside a derelict building

A refurbishment and demolition survey is required before refurbishment, structural alterations or demolition works begin. It is fully intrusive, involving the inspection of concealed areas, including floors, ceilings, wall linings and other structural elements, to identify asbestos-containing materials that may otherwise remain hidden. The building must normally be vacant during the survey.

When is each survey required?

  • Management survey: Where a building remains occupied or in normal use, providing information to manage asbestos-containing materials safely.
  • Refurbishment survey: Before any refurbishment or construction work that could disturb the building’s fabric, including strip-out works.
  • Demolition survey: Before demolition takes place. This is the most intrusive survey and aims to identify all asbestos-containing materials within the structure.

The impact on project planning and programmes

Under Regulation 5 of the Control of Asbestos Regulations 2012, a suitable and sufficient asbestos survey must be carried out before demolition work begins. The findings inform the demolition methodology, helping establish the necessary removal works, sequencing and safety controls before work can proceed.

Older industrial buildings can present additional challenges, particularly where structures have undergone multiple alterations or extensions over the years. Asbestos-containing materials may be concealed in areas not identified on existing drawings or building records. Allowing sufficient time for surveys, analysis and any subsequent removal works is therefore essential to maintaining a realistic project programme.

An integrated approach to asbestos management

At Demex, our in-house team undertakes asbestos surveys and removal works, supported by independent analytical testing and clearance where required.

By coordinating asbestos removal and demolition under one contractor, we can respond efficiently to survey findings, manage changes to the work sequence and minimise disruption to the overall project programme.